CASE STUDIES

2MVA Power Station

ABOUT THE PROJECT

Silverstone was tasked with the design, supply, installation, and commissioning of a 2MVA power station in the Pilbara region. The project was successfully carried out by Silverstone’s in-house team of engineers and trades, ensuring safety, timely completion, and adherence to the budget. Silverstone’s sustainable energy solutions stand out in the industry for their top-tier reliability and fuel efficiency. As a vertically integrated energy business, Silverstone manages turnkey projects comprehensively, serving as a one-stop shop from project initiation to completion.

TYPE

Electrical, Mechanical, Civil

LOCATION

Pilbara, WA

PERSONNEL

5

SCOPE

  • 4 x 500kva Synchronised Generators.
  • 1 x 30,000 lts fuel tank
  • 1 x Motor Control Centre
  • 1 x Service container
  • Full set of cables, fuel piping and cable ladder
  • Earth grid
  • Civil and Earthworks for level pad
  • Onsite lighting