Silverstone were engaged for the design, supply installation and commissioning of temporary power to 5 pump station locations located in-pit at Mt Whaleback. Providing dewatering solutions across Mt Whaleback sites during the removal of existing infrastructure and replacement with new infrastructure. This project required a high level of planning from our Projects and Construction team. Achieving a safe, on time, zero recordable incidents for the duration of the project.