CASE STUDIES

24 Dewatering Packages & HDPE Install

ABOUT THE PROJECT

Silverstone were engaged for the design, supply installation and commissioning of temporary power to 5 pump station locations located in-pit at Mt Whaleback. Providing dewatering solutions across Mt Whaleback sites during the removal of existing infrastructure and replacement with new infrastructure. This project required a high level of planning from our Projects and Construction team. Achieving a safe, on time, zero recordable incidents for the duration of the project.

TYPE

Mechanical, Electrical, Piping, Civil

LOCATION

Pilbara, WA

PERSONNEL

10

SCOPE

  • 24 x Generator’s on Trailer’s
  • 18 x 4000L Fuel Tanks
  • 16 x 92 to 132kW Complete Downhole Bore Pump Packages
  • 6km of Various HDPE
  • Multiple HV, LV & Creek Crossings
  • In-Pit wall Drops & Creek Discharge
  • Steel Manifold Pipework and Valves Assembly’s
  • PLC Programming & Interfacing
  • Hydro Testing, Installation & Commissioning

Outcome

Delivered on-time and in-budget.