img img
img

Power

Turnkey power generation and EPC solutions supporting mining, infrastructure and industrial operations. From diesel and hybrid power stations to battery energy storage systems (BESS), we deliver reliable energy solutions for projects of all sizes.

img img
img

Water

Comprehensive water infrastructure solutions including dewatering, groundwater management, pipelines and pumping systems. Our experienced teams support the full project lifecycle from design through to commissioning and maintenance. 

img img
img

Survey

Advanced surveying, drone mapping and spatial data solutions that support planning, construction and operational decision making. We provide accurate data and insights for mining, civil and infrastructure projects.

img img
img

Recruitment

Specialist workforce solutions connecting skilled professionals with leading employers across mining, construction, infrastructure and energy sectors. We combine industry knowledge with extensive talent networks to deliver the right people at the right time.

CASE STUDIES

EV Charging Station

ABOUT THE PROJECT

The project was successfully completed with extensive collaboration with Pilbara Minerals and Silverstone Renewables team. Despite significant challenges as this solution has never been manufactured before, Silverstone and Pilbara Minerals worked closely to execute a flawless product. Throughout the project’s execution, full compliance with all Health, Safety, Environment, and Community standards was maintained, as well as delivering a Zero incident Project.

TYPE

Electrical, Civil

LOCATION

Pilbara, WA

PERSONNEL

SCOPE

Silverstone were engaged to design, supply, manufacturer, commission and maintain the innovative Electric Vehicle charging station. The SOW included running power cables from 6MW Solar farm into a High Voltage pole top transformer and then from an 11kv to 415v transformer. The on-site installation included minor civil and earthworks to clear the pad, put a concrete foundation and installation of bollards.

Outcome

  • The Electric Bus Charged in 1.5 hours
  • Battery Range 450 kms
  • 27,000Lts of fuel saved per buses
  • Schedule – On-Time
  • Budget – Within Budget
  • Incidents and Injuries – Zero