img img
img

Power

Turnkey power generation solutions — from design and installation to commissioning and remote monitoring — including diesel, hybrid, BESS, and underground power stations.

img img
img

Water

Complete water infrastructure services — including bore drilling, HDPE pipelines, dewatering systems, and groundwater management — delivered with in-house Civil, Mechanical, and Electrical capabilities.

img img
img

Survey

Precision surveying and drone mapping for Construction, Mining, and Infrastructure projects, delivering accurate data and actionable insights.

img img
img

Recruitment

Tailored workforce solutions, providing skilled trades, operators, professionals, and project personnel — embedded on-site and backed by proven industry experience.

CASE STUDIES

Heavy and Light Vehicle Standpipe System

ABOUT THE PROJECT

Silverstone were engaged to design, supply and construct new water infrastructure for a Heavy Vehicle and Light Vehicle Standpipe System, for critical water supply to mining operations dust suppression.

TYPE

Electrical, Mechanical, Design & Construct, Civil

LOCATION

Pilbara, WA

PERSONNEL

14

SCOPE

  • Design pipeline route and sizing
  • Size, supply and installation of 2 x Diesel Drive Centrifugal Pumps
  • Design, Supply and Installation of 2 x Solar Telemetry Panels
  • Design, Supply and Installation of pumping valve station
  • Survey Set out of Clearing Boundary
  • Clear, Grub and Grade Pipeline Corridor
  • Installation of 3km of DN450 PN12.5 PE100 Coex HDPE from Turkey’s Nest to Standpipe locations
  • Supply and Installation of Air Release Valve Assemblies & Drain Valve Assemblies
  • Burial of Approximately 200 metres Creek Crossing
  • Excavation, Backfill and Compaction of 3 x Light Vehicle Road Crossings
  • Supply and installation of Lv & Hv Standpipe
  • Excavation, Backfill and Compaction of New Conduit System for Local Control Panels for LV and HV Standpipes
  • Design, Supply and Installation of 2 x LCS Panels
  • Supply and Installation of Lighting at Turkey’s Nest, LV Standpipe, HV Standpipe and Valve Station
  • Commissioning of Telemetry Panels, LCS Panels, valves and Diesel Pump

Outcome

Silverstone delivered a critical infrastructure project for mining operations, on time and on budget for the client. The team’s commitment to safe work resulted in an incident free project.